• DocumentCode
    344278
  • Title

    Design optimization of the proposed ISAC-2 project at TRIUMF

  • Author

    Laxdal, R.E. ; Baartman, R.A.

  • Volume
    5
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    3537
  • Abstract
    A radioactive ion beam facility, ISAC, is presently under construction at TRIUMF The post-accelerator takes ions of A/q⩽30 from 2 keV/u to energies up to 1.5 MeV/u. For the next five year plan, it is intended to increase the final energy above the Coulomb barrier (roughly 6.5 MeV/u) and broaden the mass range up to roughly A=150. The ISAC-2 proposal utilizes the existing RFQ, and a new IH drift tube linac to reach a new stripping energy of 0.4 MeV/u. A post-stripper superconducting linac will accelerate ions with 3⩽A/q⩽7 to 6.5 MeV/u for the heaviest ions and to more than twice this value for the lightest ions. This paper documents the optimization of the ISAC-2 linac design
  • Keywords
    ion accelerators; linear accelerators; radioactive ion beams; 35 MHz; IH drift tube linac; ISAC-2 linac design; ISAC-2 proposal; RFQ; TRIUMF; post-accelerator; post-stripper superconducting linac; radioactive ion beam facility; Acceleration; Design optimization; Frequency; Linear particle accelerator; Particle beams; Power dissipation; Strips; Surface impedance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1999. Proceedings of the 1999
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-5573-3
  • Type

    conf

  • DOI
    10.1109/PAC.1999.792362
  • Filename
    792362