Small or large hydropower plant design, construction and operation are complex tasks. Thousands of details must be well conceived and executed, and carefully coordinated for a project to achieve safe and economical operation that can be judged a social, technical and environmental success. Any hydroelectric installation, as a rule, should be designed using several stages. At each stage, all project documentation should be reviewed by independent reviewers selected and nominated by official authorities. Reducing the amount of analyses, without justification, or worse yet, neglecting the design procedures puts the project at risk. A collaborative effort at reducing this risk is thus advocated.
Keywords
electrical safety; environmental factors; hydroelectric power stations; economical operation; environmental success; hydropower plant design; project documentation; Civil engineering; Design engineering; Documentation; Environmental economics; Guidelines; Hydroelectric power generation; Investments; Large-scale systems; Power generation economics; Risk analysis; Guidelines; Hydro power; Large plants; Project stages; Review; Risk; Runaway; Small hydro;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Power Conference, 2007. EPC 2007. IEEE Canada
Conference_Location
Montreal, Que.
Print_ISBN
978-1-4244-1444-4
Electronic_ISBN
978-1-4244-1445-1
Type
conf
DOI
10.1109/EPC.2007.4520312
Filename
4520312
Link To Document