Abstract :
This paper describes the detailed modeling and simulation of a wind farm composed of eight doubly-fed induction generators (DFIG) connected to a 24-bus electrical network. Once built, the model was brought to real-time using the eMEGAsim, a Simulink-based, distributed real-time simulator of electrical power systems. Then, analysis of the steady-state and transient response of the system is made. Finally, the paper concludes with a discussion on the off-line performance and the real-time performance on the eMEGAsim simulator.
Keywords :
asynchronous generators; distributed power generation; wind power plants; detailed wind farm model; distributed real-time simulator; doubly-fed induction generators; electrical power systems; multibus network; Computational modeling; Induction generators; Power engineering and energy; Power system analysis computing; Power system control; Power system modeling; Power system simulation; Real time systems; System testing; Wind farms; accelerated simulation; detailed modeling; doubly-fed induction generator; electrical network; electromagnetic transients; hardware-in-the-loop; off-line simulation; real-time simulation; wind energy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Power Conference, 2007. EPC 2007. IEEE Canada
Conference_Location :
Montreal, Que.
Print_ISBN :
978-1-4244-1444-4
Electronic_ISBN :
978-1-4244-1445-1
Type :
conf
DOI :
10.1109/EPC.2007.4520321
Filename :
4520321
Link To Document :
بازگشت