• DocumentCode
    3446915
  • Title

    On-site testing of cable systems after laying, monitoring with HF partial discharge detection

  • Author

    Pultrum, E.

  • Author_Institution
    KEMA Nederland B.V., Arnhem
  • fYear
    1995
  • fDate
    20-21 Nov 1995
  • Abstract
    At KEMA, a new high frequency measuring technique is developed to detect partial discharges in HV polymer insulated power cables and accessories. This complete system makes it possible to perform on-site PD measurements focused on accessories, without any connection to high voltage parts of the system. The measurements are based on newly developed techniques, while the PD determination is based on traditional rules because of the PD-phase-angle relation. The first field measurements with this complete system are presently being performed
  • Keywords
    cable jointing; cable laying; electric connectors; electric current measurement; insulation testing; organic insulating materials; partial discharges; polymers; power cable insulation; power cable testing; HF partial discharge detection; HV power cables; PD measurements; field measurements; monitoring; on-site testing; phase-angle relation; polymer insulation breakdown; power cable accessories;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Supertension, IEE Two Day Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19951346
  • Filename
    494737