• DocumentCode
    3447722
  • Title

    Minimizing utility-scale PV power plant LCOE through the use of high capacity factor configurations

  • Author

    Campbell, Matthew ; Blunden, Julie ; Smeloff, Ed ; Aschenbrenner, Peter

  • Author_Institution
    SunPower Corp., San Jose, CA, USA
  • fYear
    2009
  • fDate
    7-12 June 2009
  • Abstract
    PV power plants have emerged in recent years as a viable means of large-scale renewable energy power generation. A critical question facing these PV plants at the utility-scale is the competitiveness of their energy generation cost with that of other sources. A common means of comparing the relative cost of electricity from a generating source is through a levelized cost of energy (LCOE) calculation. The LCOE equation allows alternative technologies to be compared when different scales of operation, investment or operating time periods exist. This paper reviews the LCOE drivers for a PV power plant and the impact of a plant´s capacity factor on the system LCOE. The impact of solar tracking to a plant´s capacity factor is reviewed as well as well as the economic tradeoffs between fixed and tracking systems.
  • Keywords
    photovoltaic power systems; high capacity factor configurations; levelized cost of energy; renewable energy power generation; solar tracking; utility-scale PV power plant; Power generation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Photovoltaic Specialists Conference (PVSC), 2009 34th IEEE
  • Conference_Location
    Philadelphia, PA
  • ISSN
    0160-8371
  • Print_ISBN
    978-1-4244-2949-3
  • Electronic_ISBN
    0160-8371
  • Type

    conf

  • DOI
    10.1109/PVSC.2009.5411650
  • Filename
    5411650