DocumentCode
3448029
Title
Transfer of the phase process through the border between two time scales
Author
Dobrogowski, Andrzej
Author_Institution
Inst. of Electron. & Telecommun., Poznan Tech. Univ., Poland
fYear
1996
fDate
5-7 Mar 1996
Firstpage
88
Lastpage
91
Abstract
The transfer of a digital signal across the border between different time scales can be effectively analysed in terms of synchronization of corresponding gapped clocks clocking the data stream at both sides of the border. Analysis is strongly supported by graphs presented in the paper. Parameters of synchronization process (e.g., PJE rate, hysteresis) depend on the elastic store capacity and pattern of gaps (including justification) of gapped clocks
Keywords
synchronisation; PJE rate; Virtual Container level 4; border between time scales; data stream clocking; digital communication network; digital signal transfer; elastic store capacity; gapped clocks; hysteresis; pattern of gaps; phase process transfer; synchronization; synchronous digital hierarchy; timing pulses;
fLanguage
English
Publisher
iet
Conference_Titel
European Frequency and Time Forum, 1996. EFTF 96., Tenth (IEE Conf. Publ. 418)
Conference_Location
Brighton
ISSN
0537-9989
Print_ISBN
0-85296-661-X
Type
conf
DOI
10.1049/cp:19960022
Filename
583565
Link To Document