DocumentCode :
3448864
Title :
The Design of Substation Avalanche Test System Based on B Code
Author :
Guo Ying ; Liu Nan
Author_Institution :
Sch. of Inf. Sci. & Eng., Shenyang Univ. of Technol., Shenyang, China
fYear :
2013
fDate :
1-3 Nov. 2013
Firstpage :
103
Lastpage :
106
Abstract :
This paper describes a substation avalanche test system which is based on B code. The system supports simultaneous operation of multiple remote signaling and can ensure the synchronization and accuracy of time´s movement. Using platform of ARM9 hardware and embedded operating systems, the system has lots of feature, such as high integration, small size and stable. The host computer can operate the device directly through the serial port, the operating parameters can be set and read from host computer. Analysis shows that the designed system can guarantee the stable of the operation of smart power grids devices.
Keywords :
codes; embedded systems; operating systems (computers); smart power grids; substations; synchronisation; ARM9 hardware; B code; embedded operating systems; remote signaling; serial port; smart power grids devices; substation avalanche test system design; synchronization; Accuracy; Computers; Decoding; Microprocessors; Standards; Substations; Synchronization; B code; avalanche tested; embedded operating system; time synchronization system;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Networks and Intelligent Systems (ICINIS), 2013 6th International Conference on
Conference_Location :
Shenyang
Print_ISBN :
978-1-4799-2808-8
Type :
conf
DOI :
10.1109/ICINIS.2013.33
Filename :
6754682
Link To Document :
بازگشت