• DocumentCode
    3448864
  • Title

    The Design of Substation Avalanche Test System Based on B Code

  • Author

    Guo Ying ; Liu Nan

  • Author_Institution
    Sch. of Inf. Sci. & Eng., Shenyang Univ. of Technol., Shenyang, China
  • fYear
    2013
  • fDate
    1-3 Nov. 2013
  • Firstpage
    103
  • Lastpage
    106
  • Abstract
    This paper describes a substation avalanche test system which is based on B code. The system supports simultaneous operation of multiple remote signaling and can ensure the synchronization and accuracy of time´s movement. Using platform of ARM9 hardware and embedded operating systems, the system has lots of feature, such as high integration, small size and stable. The host computer can operate the device directly through the serial port, the operating parameters can be set and read from host computer. Analysis shows that the designed system can guarantee the stable of the operation of smart power grids devices.
  • Keywords
    codes; embedded systems; operating systems (computers); smart power grids; substations; synchronisation; ARM9 hardware; B code; embedded operating systems; remote signaling; serial port; smart power grids devices; substation avalanche test system design; synchronization; Accuracy; Computers; Decoding; Microprocessors; Standards; Substations; Synchronization; B code; avalanche tested; embedded operating system; time synchronization system;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Networks and Intelligent Systems (ICINIS), 2013 6th International Conference on
  • Conference_Location
    Shenyang
  • Print_ISBN
    978-1-4799-2808-8
  • Type

    conf

  • DOI
    10.1109/ICINIS.2013.33
  • Filename
    6754682