Author :
Andreev, V. ; Gorchenko, V. ; Govorov, A. ; Kirichenko, A. ; Kovalenko, A. ; Kulikov, I. ; Mikhailov, V. ; Monchinsky, V. ; Romanov, S. ; Sveshnikov, B. ; Tsarenkov, A. ; Vasilishin, B. ; Voevodin, M. ; Volkov, V.
Abstract :
The superconducting synchrotron Nuclotron was put into operation in March 1993 at the Laboratory of High Energies, JINR in Dubna. The Nuclotron Control System (NCS) provided an efficient support for machine operation during all runs. The dedicated NCS subsystem for beam diagnostics in the injection transfer line and the Nuclotron ring is described
Keywords :
accelerator control systems; ion accelerators; particle beam diagnostics; synchrotrons; Nuclotron; Nuclotron Control System; beam diagnostics; control system; injection transfer line; superconducting synchrotron; Acceleration; Communication system control; Particle beam injection; Personal communication networks; Pulse measurements; Remote monitoring; Superconducting magnets; Tungsten; Wires; Workstations;