DocumentCode
345216
Title
Ramp management in RHIC
Author
Kewisch, J. ; van Zeijts, J. ; Peggs, S. ; Satogata, T.
Author_Institution
Brookhaven Nat. Lab., Upton, NY, USA
Volume
2
fYear
1999
fDate
1999
Firstpage
705
Abstract
In RHIC, magnets and RF cavities are controlled by Wave Form Generators (WFGs), simple real time computers which generate the set points. The WFGs are programmed to change set points from one state to another in a synchronized way. Such transition is called a “Ramp” and consists of a sequence of “stepping stones” which contain the set point of every WFG controlled device at a point in time. An appropriate interpolation defines the set points between these stepping stones. This report describes the implementation of the ramp system. The user interface, tools to create and modify ramps, interaction with modeling tools and measurements and correction programs are discussed
Keywords
accelerator cavities; accelerator control systems; accelerator magnets; colliding beam accelerators; ion accelerators; real-time systems; storage rings; superconducting magnets; synchrotrons; RF cavities; RHIC ramp management; Wave Form Generators; correction programs; magnets; modeling tools; simple real time computers; stepping stones; user interface; Energy management; Energy measurement; Extraterrestrial measurements; Interpolation; Magnets; Optical design; Optical scattering; Radio frequency; Storage rings; User interfaces;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location
New York, NY
Print_ISBN
0-7803-5573-3
Type
conf
DOI
10.1109/PAC.1999.795328
Filename
795328
Link To Document