DocumentCode :
345296
Title :
Superconducting RF Lab facility upgrades at Los Alamos
Author :
Katonak, D.J. ; Rusnak, B.
Author_Institution :
Los Alamos Nat. Lab., NM, USA
Volume :
2
fYear :
1999
fDate :
1999
Firstpage :
974
Abstract :
Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper
Keywords :
accelerator cavities; clean rooms; superconducting cavity resonators; LANL; Los Alamos; Los Alamos National Laboratory; cleanroom facilities; extensive contamination control resources; high-cavity fields; high-pressure rinse cleaning process equipment; multi-cell superconducting cavities; prototype cryomodules; superconducting RF Lab facility upgrades; Assembly; Building materials; Circuits; Cleaning; Floors; Laboratories; Personnel; Radio frequency; Steel; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location :
New York, NY
Print_ISBN :
0-7803-5573-3
Type :
conf
DOI :
10.1109/PAC.1999.795419
Filename :
795419
Link To Document :
بازگشت