DocumentCode
345323
Title
Response of the RF power system to off-normal conditions on APT
Author
McCarthy, M. ; Overett, T. ; Tooker, J. ; Lynch, M. ; Rees, D. ; Regan, A. ; Wangler, T.
Author_Institution
Gen. Atomics, San Diego, CA, USA
Volume
2
fYear
1999
fDate
1999
Firstpage
1061
Abstract
The Accelerator Production of Tritium (APT) plant utilizes a 1700 MeV linear accelerator. The accelerating potential for the 100 mA proton beam is provided by up to (depending on production requirements) 244 one MW klystrons. Control of amplitude and phase at each coupling port provides optimum beam parameters. However, when a fault occurs or operation is required at reduced beam currents (`off-normal conditions´), the Radio Frequency (RF) system must compensate to maintain the cavity field. This paper describes the projected off-normal conditions and the response of the RF system to accommodate these conditions and minimize downtime
Keywords
accelerator RF systems; klystrons; linear accelerators; proton accelerators; 100 mA; 1700 MeV; APT; Accelerator Production of Tritium; RF power system; accelerating potential; cavity field; coupling port; klystrons; linear accelerator; off-normal conditions; optimum beam parameters; proton beam; Acceleration; Klystrons; Linear accelerators; Linear particle accelerator; Optical coupling; Particle beams; Power systems; Production; Radio frequency; Superconducting transmission lines;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location
New York, NY
Print_ISBN
0-7803-5573-3
Type
conf
DOI
10.1109/PAC.1999.795448
Filename
795448
Link To Document