DocumentCode :
345346
Title :
Commissioning of KEKB bunch feedback systems
Author :
Tobiyama, M. ; Kikutani, E.
Author_Institution :
KEK, Tuskuba, Japan
Volume :
2
fYear :
1999
fDate :
1999
Firstpage :
1138
Abstract :
Commissioning of KEKB started at the end of the last year. In the early stages of the commissioning, we observed transverse instabilities in both rings and started tuning of the bunch feedback systems. Even though the tuning is now at the initial stage, the feedback systems are contributing to an increase of the maximum storable currents in the KEKB rings. Feedback-related systems, tune meters and bunch-current monitors, are also working well
Keywords :
accelerator control systems; colliding beam accelerators; electron accelerators; feedback; particle beam bunching; particle beam stability; storage rings; KEKB bunch feedback systems; bunch-current monitors; commissioning; feedback-related systems; storable currents; transverse instabilities; tune meters; Broadband amplifiers; Digital signal processing; Electrodes; Electron beams; Feedback; Feeds; Frequency; Large-scale systems; Positrons; Signal processing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location :
New York, NY
Print_ISBN :
0-7803-5573-3
Type :
conf
DOI :
10.1109/PAC.1999.795474
Filename :
795474
Link To Document :
بازگشت