• DocumentCode
    3453631
  • Title

    The integrated maintenance program

  • Author

    Kolonay, J.F. ; Maguire, H.T., Jr.

  • Author_Institution
    Westinghouse Nucl. & Adv. Technol. Div., Pittsburgh, PA, USA
  • fYear
    1991
  • fDate
    2-9 Nov. 1991
  • Firstpage
    1410
  • Abstract
    The authors point out that a comprehensive and integrated approach is required to address adequately the varied needs and interfaces which drive a plant maintenance program. The functional performance designed into the equipment must be understood and combined with all the requirements external to the equipment in order to provide an effective and justifiable maintenance program. A systematic process of development and documentation of the engineering basis for the overall maintenance plan can satisfy all the necessary requirements while providing a very efficient means to build and maintain the necessary documentation. Finally, particular attention to the details of program interfaces is essential.<>
  • Keywords
    nuclear reactor maintenance; documentation; equipment; functional performance; integrated maintenance program; maintenance plan; nuclear power plants; plant maintenance; Costs; Documentation; Electric breakdown; Feedback; Maintenance engineering; Power industry; Power system reliability; Production; Regulators; Safety;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Nuclear Science Symposium and Medical Imaging Conference, 1991., Conference Record of the 1991 IEEE
  • Conference_Location
    Santa Fe, NM, USA
  • Print_ISBN
    0-7803-0513-2
  • Type

    conf

  • DOI
    10.1109/NSSMIC.1991.258808
  • Filename
    258808