DocumentCode
345571
Title
LHC beam instrumentation
Author
Bosser, J. ; Bovet, C. ; Fischer, C. ; Jung, R. ; Koziol, H. ; Schmickler, H. ; Vos, L.
Author_Institution
CERN, Geneva, Switzerland
Volume
1
fYear
1999
fDate
1999
Firstpage
465
Abstract
Six years before the scheduled commissioning of the LHC at CERN, the basic list of beam instruments has been established. This early date is needed due to the impact of the mechanical design of some detectors (mainly the beam position detectors) on the cryogenic part of the machine as well as for other projects due to the long R&D period (emittance measurements, tune and chromaticity diagnostics and control). This paper gives a detailed overview of the basic requirements and specifications of all beam instruments foreseen for transfer lines and main rings
Keywords
accelerator control systems; beam handling equipment; colliding beam accelerators; particle beam diagnostics; position measurement; proton accelerators; storage rings; synchrotrons; LHC beam instrumentation; Large Hadron Collider; beam position detectors; chromaticity control; chromaticity diagnostics; emittance measurements; main rings; storage ring; synchrotron; transfer lines; tune diagnostics; Bandwidth; Current transformers; Extraterrestrial measurements; Instruments; Large Hadron Collider; Mechanical variables measurement; Particle beams; Position measurement; Research and development; Wideband;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location
New York, NY
Print_ISBN
0-7803-5573-3
Type
conf
DOI
10.1109/PAC.1999.795733
Filename
795733
Link To Document