• DocumentCode
    3458031
  • Title

    The Research of the Settlement Model in Construction Contract Price Based on the Time Value

  • Author

    Xiang, Jianguo ; Yu, Huigang

  • Author_Institution
    Zhejiang Coll. of Constr., Hangzhou
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    This paper establishes a model of equivalent price settlement (time-dependent) in engineering construction contracts brought by the principle of time value of capital and completes a sensitivity analysis to the value realization of the contract price from three aspects of the changes in rate of return on investments, settlement frequency and cascade reduced settlement of the project. The calculating analysis proves that the time value of capital is an objective existence, which requires construction companies to speed cash flow, early recovery of funds, meanwhile, it also calls for changing the current manner of equivalent price settlement (time-independent).
  • Keywords
    civil engineering; construction industry; contracts; investment; sensitivity analysis; cascade reduced settlement; construction contract price; engineering construction contract; sensitivity analysis; settlement frequency; time value of capital; Building materials; Costs; Forward contracts; Frequency; Investments; Sensitivity analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.1780
  • Filename
    4679969