DocumentCode
3458031
Title
The Research of the Settlement Model in Construction Contract Price Based on the Time Value
Author
Xiang, Jianguo ; Yu, Huigang
Author_Institution
Zhejiang Coll. of Constr., Hangzhou
fYear
2008
fDate
12-14 Oct. 2008
Firstpage
1
Lastpage
3
Abstract
This paper establishes a model of equivalent price settlement (time-dependent) in engineering construction contracts brought by the principle of time value of capital and completes a sensitivity analysis to the value realization of the contract price from three aspects of the changes in rate of return on investments, settlement frequency and cascade reduced settlement of the project. The calculating analysis proves that the time value of capital is an objective existence, which requires construction companies to speed cash flow, early recovery of funds, meanwhile, it also calls for changing the current manner of equivalent price settlement (time-independent).
Keywords
civil engineering; construction industry; contracts; investment; sensitivity analysis; cascade reduced settlement; construction contract price; engineering construction contract; sensitivity analysis; settlement frequency; time value of capital; Building materials; Costs; Forward contracts; Frequency; Investments; Sensitivity analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location
Dalian
Print_ISBN
978-1-4244-2107-7
Electronic_ISBN
978-1-4244-2108-4
Type
conf
DOI
10.1109/WiCom.2008.1780
Filename
4679969
Link To Document