Title :
A Decision Method of Concession Period for Build-Operate-Transfer Projects of Sewage Treatment
Author :
Song Jinbo ; Han Shoudong ; Wang Dongbo
Author_Institution :
Sch. of Manage., Dalian Univ. of Technol., Dalian
fYear :
2008
fDate :
12-14 Oct. 2008
Firstpage :
1
Lastpage :
4
Abstract :
Concession period is a key parameter in build-operate-transfer (BOT) contract. Previous studies have provided effective methodologies and theory for the development of decision methods of concession period. Nevertheless, it appears that risk and uncertainty has been little considered in studying the way to determine the concession period of BOT projects. This paper proposes a decision method of concession period for BOT projects of sewage treatment by using NPV and Monte Carlo simulation, and discusses a list of deterministic and uncertain parameters in BOT projects of sewage treatment. A case study is given that indicates how the simulation technique is applied to determine the concession period.
Keywords :
Monte Carlo methods; sewage treatment; Monte Carlo simulation; NPV simulation; build-operate-transfer projects; concession period decision method; sewage treatment; Construction industry; Contracts; Decision making; Equations; Government; Investments; Project management; Sewage treatment; Technology management; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.1803
Filename :
4679992
Link To Document :
بازگشت