DocumentCode
3458934
Title
Engineering Construction Accident Prediction and Controlling Technology Based on Grade of Likelihood of Accident Occurrence
Author
Zheng, Xiazhong ; Li, Yan
Author_Institution
Coll. of Econ. & Manage., China Three Gorges Univ., Yichang
fYear
2008
fDate
12-14 Oct. 2008
Firstpage
1
Lastpage
6
Abstract
This paper discusses the classification on the grade of likelihood of accident occurrence in prediction and severity of the consequences of accidents, based on construction characteristics of large and medium-sized projects and questions put forward in site safety management. Practically, the likelihood of accident occurrence is classified into five fuzzy grades. Under the premise conditions of probable occurrence of low probability accidents, the paper modifies the theory of "probable occurrence" and "improbable occurrence". And it classifies severity of the consequences of accident into four grades and introduces the identification of grade and accident control technology in detail.
Keywords
accident prevention; construction industry; fuzzy set theory; industrial accidents; probability; project management; accident occurrence likelihood; engineering construction accident prediction; fuzzy grade; large-sized project; medium-sized project; probability; site safety management; Accidents; Control systems; Economic forecasting; Energy measurement; Environmental economics; Feedforward systems; Loss measurement; Project management; Safety; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location
Dalian
Print_ISBN
978-1-4244-2107-7
Electronic_ISBN
978-1-4244-2108-4
Type
conf
DOI
10.1109/WiCom.2008.1827
Filename
4680016
Link To Document