• DocumentCode
    3458995
  • Title

    Matrix Analysis of the Relationship between Compensation Claim Case and Expenditures in Construction Claim Management

  • Author

    Wang Bangjun ; Ji Feng ; Zhou Min

  • Author_Institution
    Dept. of M.S. &I. E., China Univ. of Min. & Technol., Xuzhou
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    In project management, contractors´ claims are beneficial methods to improve their economic benefits. Pivotal step of claim is to analyze the on-going claim event. This paper, firstly, has established two fuzzy matrixes on the relationships between claim events and expenditures to claim causes independently. Secondly, the relationship has been analyze directly between claim causes and expenditures through combing with these.
  • Keywords
    construction industry; fuzzy set theory; matrix algebra; project management; Pivotal step; compensation claim case; construction claim management; fuzzy matrix; matrix analysis; project management; Contracts; Costs; Electronic mail; Fuzzy sets; Law; Legal factors; Power generation; Power generation economics; Project management; Technology management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.1831
  • Filename
    4680020