Difficulties and Countermeasures of the Contractor´s Claim in Hydropower Project
Author
Chen, Zhiding ; Hu, Zhigen ; Liu, Quan ; Han, Lijun
Author_Institution
State Key Lab. of Water Resource & Hydropower Eng. Sci., Wuhan Univ., Wuhan
fYear
2008
fDate
12-14 Oct. 2008
Firstpage
1
Lastpage
4
Abstract
Hydropower project construction is becoming increasingly susceptible to various factors that give rise to time extension and cost overrun. Hydropower project construction contract claim is becoming both more numerous and more costly. Increasing attention is today being focused on the issue of claims and disputes resolution in the hydropower project construction. Although the hydropower project construction business environment has moved toward partnering arrangements in recent years, the number of contractual difficulties continues to rise. The paper presents the difficulties of the contractor´s claim in hydropower project construction. The countermeasures for the contractor´s claim have been analyzed. A case, which is a permanent ship lock of one hydropower project construction in China, has been studied. The case study shown that claim is an effective approach for the contractor to compensate for damages and strive for profit at the present construction business environment of hydropower project.
Keywords
electrical contracting; hydroelectric power stations; China; contractors claim; hydropower project construction contract; Buildings; Contracts; Costs; Hydroelectric power generation; Laboratories; Law; Legal factors; Marine vehicles; Project management; Water resources;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location
Dalian
Print_ISBN
978-1-4244-2107-7
Electronic_ISBN
978-1-4244-2108-4
Type
conf
DOI
10.1109/WiCom.2008.1837
Filename
4680026
Link To Document