Difficulties and Countermeasures of the Contractor´s Claim in Hydropower Project
Author :
Chen, Zhiding ; Hu, Zhigen ; Liu, Quan ; Han, Lijun
Author_Institution :
State Key Lab. of Water Resource & Hydropower Eng. Sci., Wuhan Univ., Wuhan
fYear :
2008
fDate :
12-14 Oct. 2008
Firstpage :
1
Lastpage :
4
Abstract :
Hydropower project construction is becoming increasingly susceptible to various factors that give rise to time extension and cost overrun. Hydropower project construction contract claim is becoming both more numerous and more costly. Increasing attention is today being focused on the issue of claims and disputes resolution in the hydropower project construction. Although the hydropower project construction business environment has moved toward partnering arrangements in recent years, the number of contractual difficulties continues to rise. The paper presents the difficulties of the contractor´s claim in hydropower project construction. The countermeasures for the contractor´s claim have been analyzed. A case, which is a permanent ship lock of one hydropower project construction in China, has been studied. The case study shown that claim is an effective approach for the contractor to compensate for damages and strive for profit at the present construction business environment of hydropower project.
Keywords :
electrical contracting; hydroelectric power stations; China; contractors claim; hydropower project construction contract; Buildings; Contracts; Costs; Hydroelectric power generation; Laboratories; Law; Legal factors; Marine vehicles; Project management; Water resources;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.1837
Filename :
4680026
Link To Document :
بازگشت