• DocumentCode
    3460967
  • Title

    Extreme re: what if there is no time for requirements engineering?

  • Author

    Greenspan, Sol J.

  • Author_Institution
    Verizon Communications Inc.
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    282
  • Lastpage
    284
  • Keywords
    Bicycles; Costs; Documentation; Error correction; Performance evaluation; Phase detection; Process control; Scheduling; Time factors; Time to market;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Requirements Engineering, 2001. Proceedings. Fifth IEEE International Symposium on
  • Print_ISBN
    0-7695-1125-2
  • Type

    conf

  • DOI
    10.1109/ISRE.2001.948585
  • Filename
    948585