DocumentCode
3460967
Title
Extreme re: what if there is no time for requirements engineering?
Author
Greenspan, Sol J.
Author_Institution
Verizon Communications Inc.
fYear
2001
fDate
2001
Firstpage
282
Lastpage
284
Keywords
Bicycles; Costs; Documentation; Error correction; Performance evaluation; Phase detection; Process control; Scheduling; Time factors; Time to market;
fLanguage
English
Publisher
ieee
Conference_Titel
Requirements Engineering, 2001. Proceedings. Fifth IEEE International Symposium on
Print_ISBN
0-7695-1125-2
Type
conf
DOI
10.1109/ISRE.2001.948585
Filename
948585
Link To Document