• DocumentCode
    3464141
  • Title

    Guidelines for specification development

  • Author

    Belev, George C.

  • Author_Institution
    Gen. Electr. Co., Schenectady, NY, USA
  • fYear
    1989
  • fDate
    24-26 Jan 1989
  • Firstpage
    15
  • Lastpage
    21
  • Abstract
    The author provides formats and checklists designed to minimize the ambiguity, minimize overall procurement costs and maximize the potential of receiving items, materials or services desired on time, at or under the budgeted costs and in accordance with the specifications. Methodologies such as acquisition streamlining, tiering reviews and value analysis are mentioned to focus attention on which requirements are necessary (represent the actual minimum needs of the engineer) and eliminate those that are not needed or cost effective, while not compromising the performance or negatively impacting quality
  • Keywords
    economics; quality control; reliability; acquisition streamlining; ambiguity; checklists; formats; procurement costs; quality; specification development; tiering reviews; value analysis; Assembly; Contracts; Costs; Data engineering; Design engineering; Engineering management; Guidelines; Performance evaluation; Procurement; Warranties;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability and Maintainability Symposium, 1989. Proceedings., Annual
  • Conference_Location
    Atlanta, GA
  • Type

    conf

  • DOI
    10.1109/ARMS.1989.49565
  • Filename
    49565