DocumentCode
3466922
Title
Construction of public crisis response ‘Peak Capacity’
Author
Zhi, Liu
Author_Institution
Sch. of Manage., Univ. of Sci. & Technol. of China, Hefei, China
Volume
2
fYear
2009
fDate
5-6 Dec. 2009
Firstpage
343
Lastpage
346
Abstract
The substance of public crisis related to the governance processes, the effectiveness of crisis management the key lies in how to identify and build the work of wartime and peacetime scenarios and working mode. Generally, a crisis management response to the crisis when there is a level of resources and capacity to the state configuration problem. How to wartime emergency, quickly and efficiently meet the needs for disaster relief resources and capabilities of the ¿peak¿ demand, a test of government regulators. This designed of a ¿Peak capacity of emergency¿ analysis framework and build system, attempted to resolve the crisis in the public issue of peak resources and capabilities, aimed at increasing a region or city faced a sudden attack to raise the ability to protect themselves.
Keywords
globalisation; public administration; social sciences; crisis management; globalization; peak capacity; public crisis response; social risk factors; state configuration problem; Crisis management; Decision making; Disaster management; Earthquakes; Government; Hospitals; Peace technology; Resource management; Technology management; Testing; measure; peak capacity of emergency; public crisis; resource allocation;
fLanguage
English
Publisher
ieee
Conference_Titel
Test and Measurement, 2009. ICTM '09. International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4244-4699-5
Type
conf
DOI
10.1109/ICTM.2009.5413034
Filename
5413034
Link To Document