• DocumentCode
    3467035
  • Title

    Scrum and CMMI Going from Good to Great

  • Author

    Jakobsen, Carsten Ruseng ; Sutherland, Jeff

  • Author_Institution
    Syst. Software Eng. A/S, Aarhus, Denmark
  • fYear
    2009
  • fDate
    24-28 Aug. 2009
  • Firstpage
    333
  • Lastpage
    337
  • Abstract
    Projects combining agile methods with CMMI combine adaptability with predictability to better serve large customer needs. The introduction of Scrum at Systematic, a CMMI level 5 company, doubled productivity and cut defects by 40% compared to waterfall projects in 2006 by focusing on early testing and time to fix builds. Systematic institutionalized Scrum across all projects and used data driven tools like story process efficiency to surface product backlog impediments. This allowed them to systematically develop a strategy for a second doubling in productivity. Two teams have achieved a sustainable quadrupling of productivity compared to waterfall projects. We discuss here the strategy to bring the entire company to that level. Our experiences shows that Scrum and CMMI together bring a more powerful combination of adaptability and predictability than either one alone and suggest how other companies can combine them to achieve Toyota level performance - 4 times the productivity and 12 times the quality of waterfall teams.
  • Keywords
    Capability Maturity Model; DP industry; productivity; project management; CMMI; Scrum; Systematic; agile methods; customer needs; surface product backlog; Contracts; Databases; Fluid flow measurement; Measurement standards; Monitoring; Performance analysis; Productivity; Software engineering; Software systems; System testing; CMMI; Flow; Lean; Scrum; measures; product owner;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Agile Conference, 2009. AGILE '09.
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    978-0-7695-3768-9
  • Type

    conf

  • DOI
    10.1109/AGILE.2009.31
  • Filename
    5261061