DocumentCode
3467035
Title
Scrum and CMMI Going from Good to Great
Author
Jakobsen, Carsten Ruseng ; Sutherland, Jeff
Author_Institution
Syst. Software Eng. A/S, Aarhus, Denmark
fYear
2009
fDate
24-28 Aug. 2009
Firstpage
333
Lastpage
337
Abstract
Projects combining agile methods with CMMI combine adaptability with predictability to better serve large customer needs. The introduction of Scrum at Systematic, a CMMI level 5 company, doubled productivity and cut defects by 40% compared to waterfall projects in 2006 by focusing on early testing and time to fix builds. Systematic institutionalized Scrum across all projects and used data driven tools like story process efficiency to surface product backlog impediments. This allowed them to systematically develop a strategy for a second doubling in productivity. Two teams have achieved a sustainable quadrupling of productivity compared to waterfall projects. We discuss here the strategy to bring the entire company to that level. Our experiences shows that Scrum and CMMI together bring a more powerful combination of adaptability and predictability than either one alone and suggest how other companies can combine them to achieve Toyota level performance - 4 times the productivity and 12 times the quality of waterfall teams.
Keywords
Capability Maturity Model; DP industry; productivity; project management; CMMI; Scrum; Systematic; agile methods; customer needs; surface product backlog; Contracts; Databases; Fluid flow measurement; Measurement standards; Monitoring; Performance analysis; Productivity; Software engineering; Software systems; System testing; CMMI; Flow; Lean; Scrum; measures; product owner;
fLanguage
English
Publisher
ieee
Conference_Titel
Agile Conference, 2009. AGILE '09.
Conference_Location
Chicago, IL
Print_ISBN
978-0-7695-3768-9
Type
conf
DOI
10.1109/AGILE.2009.31
Filename
5261061
Link To Document