DocumentCode
3469767
Title
Generation unit maintenance scheduling in electricity market environment
Author
Lu, Gang ; Wen, Fushuan ; Chung, C.Y. ; Wong, K.P.
Author_Institution
Coll. of Electr. Eng., Zhejiang Univ., Hangzhou
fYear
2008
fDate
6-9 April 2008
Firstpage
720
Lastpage
725
Abstract
Power industry restructuring has brought new challenges to the generation unit maintenance scheduling (UMS) problem. In the new electricity market environment, the traditional mechanism and approaches to unit maintenance scheduling are no longer directly applicable, some revisions are necessary so as to cater for the new circumstances. In recent years, quite a lot of research work has been done in this area around the globe, and in this paper a biographical survey is made.
Keywords
maintenance engineering; power generation scheduling; power markets; biographical survey; electricity market environment; generation unit maintenance scheduling; power industry restructuring; Decision making; Electricity supply industry; Energy management; Environmental management; Job shop scheduling; Maintenance; Power generation; Power industry; Power system management; Reliability; coordination mechanism; decision-making; electricity market; fairness; generation unit maintenance scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Utility Deregulation and Restructuring and Power Technologies, 2008. DRPT 2008. Third International Conference on
Conference_Location
Nanjuing
Print_ISBN
978-7-900714-13-8
Electronic_ISBN
978-7-900714-13-8
Type
conf
DOI
10.1109/DRPT.2008.4523500
Filename
4523500
Link To Document