• DocumentCode
    3471080
  • Title

    Design considerations of traction supply scheme for RTS system with circle line as case study

  • Author

    Thong, T.L.M. ; Cheong, W.O.A. ; Wijaya, Hadi

  • Author_Institution
    Land Transp. Authority, Singapore
  • Volume
    2
  • fYear
    2004
  • fDate
    21-24 Nov. 2004
  • Firstpage
    1886
  • Abstract
    The Singapore Circle Line (CCL) rapid transit system (RTS), which is presently under construction, is a medium capacity MRT system comprising 29 stations and is approximately 33 km long. The CCL is wholly underground. This paper seeks to present the design considerations adopted in the traction supply scheme for the CCL RTS. It discusses the initial placement of the traction power substations, the subsequent power simulations conducted and analysis of its results. It further discusses the traction network configuration as well as some protective devices used within the traction supply scheme.
  • Keywords
    rapid transit systems; substations; traction power supplies; Singapore Circle Line; power simulations; protective devices; rapid transit system; traction network; traction power substations; traction supply scheme; Analytical models; Cities and towns; Conductors; Costs; Frequency; Power system protection; Rails; Rectifiers; Substation protection; Traction power supplies;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power System Technology, 2004. PowerCon 2004. 2004 International Conference on
  • Print_ISBN
    0-7803-8610-8
  • Type

    conf

  • DOI
    10.1109/ICPST.2004.1460309
  • Filename
    1460309