DocumentCode :
3471080
Title :
Design considerations of traction supply scheme for RTS system with circle line as case study
Author :
Thong, T.L.M. ; Cheong, W.O.A. ; Wijaya, Hadi
Author_Institution :
Land Transp. Authority, Singapore
Volume :
2
fYear :
2004
fDate :
21-24 Nov. 2004
Firstpage :
1886
Abstract :
The Singapore Circle Line (CCL) rapid transit system (RTS), which is presently under construction, is a medium capacity MRT system comprising 29 stations and is approximately 33 km long. The CCL is wholly underground. This paper seeks to present the design considerations adopted in the traction supply scheme for the CCL RTS. It discusses the initial placement of the traction power substations, the subsequent power simulations conducted and analysis of its results. It further discusses the traction network configuration as well as some protective devices used within the traction supply scheme.
Keywords :
rapid transit systems; substations; traction power supplies; Singapore Circle Line; power simulations; protective devices; rapid transit system; traction network; traction power substations; traction supply scheme; Analytical models; Cities and towns; Conductors; Costs; Frequency; Power system protection; Rails; Rectifiers; Substation protection; Traction power supplies;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power System Technology, 2004. PowerCon 2004. 2004 International Conference on
Print_ISBN :
0-7803-8610-8
Type :
conf
DOI :
10.1109/ICPST.2004.1460309
Filename :
1460309
Link To Document :