Design considerations of traction supply scheme for RTS system with circle line as case study
Author
Thong, T.L.M. ; Cheong, W.O.A. ; Wijaya, Hadi
Author_Institution
Land Transp. Authority, Singapore
Volume
2
fYear
2004
fDate
21-24 Nov. 2004
Firstpage
1886
Abstract
The Singapore Circle Line (CCL) rapid transit system (RTS), which is presently under construction, is a medium capacity MRT system comprising 29 stations and is approximately 33 km long. The CCL is wholly underground. This paper seeks to present the design considerations adopted in the traction supply scheme for the CCL RTS. It discusses the initial placement of the traction power substations, the subsequent power simulations conducted and analysis of its results. It further discusses the traction network configuration as well as some protective devices used within the traction supply scheme.
Keywords
rapid transit systems; substations; traction power supplies; Singapore Circle Line; power simulations; protective devices; rapid transit system; traction network; traction power substations; traction supply scheme; Analytical models; Cities and towns; Conductors; Costs; Frequency; Power system protection; Rails; Rectifiers; Substation protection; Traction power supplies;
fLanguage
English
Publisher
ieee
Conference_Titel
Power System Technology, 2004. PowerCon 2004. 2004 International Conference on
Print_ISBN
0-7803-8610-8
Type
conf
DOI
10.1109/ICPST.2004.1460309
Filename
1460309
Link To Document