• DocumentCode
    3471540
  • Title

    Change point estimation in multi-attribute processes

  • Author

    Niaki, S.T.A. ; Khedmati, M.

  • Author_Institution
    Dept. of Ind. Eng., Sharif Univ. of Technol., Tehran, Iran
  • fYear
    2011
  • fDate
    14-17 Sept. 2011
  • Firstpage
    580
  • Lastpage
    584
  • Abstract
    Identification of the change point in multi-attribute processes make the corrective measures to be employed sooner. This of course results in considerable amount of time and money savings. In real-world problems, since most of the process changes are due to instantaneous causes (step-change), a new method is proposed in this paper to derive the maximum likelihood estimator of the time of a step-change in the mean vector of multi-attribute processes. The results of a performance study based on a numerical example are encouraging.
  • Keywords
    control charts; maximum likelihood estimation; quality control; change point estimation; corrective measures; instantaneous cause method; maximum likelihood estimation; mean vector; multiattribute processes; step change method; Control charts; Correlation; Covariance matrix; Gaussian distribution; Maximum likelihood estimation; Monitoring; Process control; Change Point Estimation; Maximum Likelihood Estimator; Multi-attribute Processes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality and Reliability (ICQR), 2011 IEEE International Conference on
  • Conference_Location
    Bangkok
  • Print_ISBN
    978-1-4577-0626-4
  • Type

    conf

  • DOI
    10.1109/ICQR.2011.6031606
  • Filename
    6031606