• DocumentCode
    3474448
  • Title

    New lower bound for the hybrid flowshop scheduling problem

  • Author

    Vignier, A. ; Commandeur, P. ; Proust, C.

  • Author_Institution
    Lab. d´´Inf., Tours Univ., France
  • fYear
    1997
  • fDate
    9-12 Sep 1997
  • Firstpage
    446
  • Lastpage
    451
  • Abstract
    This paper deals with the hybrid flowshop scheduling problem (HFSP). We propose a new lower bound for the maximum completion time (makespan) criterion and a branch and bound procedure to solve a k-stage HFSP in which the maximum completion time is the criterion to be optimized. This problem has been already treated but we prove that our bound is better than those derived for the same criterion. To illustrate this dominance property, we propose experimental results in order to show the efficiency of this bound
  • Keywords
    operations research; optimisation; production control; tree searching; branch and bound; completion time; flowshop scheduling; lower bound; optimisation; production control; search trees; Lot sizing; Mathematical programming; Processor scheduling; Scheduling algorithm; Upper bound;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation Proceedings, 1997. ETFA '97., 1997 6th International Conference on
  • Conference_Location
    Los Angeles, CA
  • Print_ISBN
    0-7803-4192-9
  • Type

    conf

  • DOI
    10.1109/ETFA.1997.616312
  • Filename
    616312