• DocumentCode
    3475358
  • Title

    Raw material ship operation scheduling system in steelworks

  • Author

    Matsuda, Kouichi ; Katou, Hiroyuki ; Okata, Toshihito ; Hoshino, Koichi ; Kakisaka, Isao ; Orikata, Toshihiko

  • Author_Institution
    Process Technol. Res. Lab., Kobe Steel Ltd., Japan
  • Volume
    6
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    481
  • Abstract
    We adopt the simulated annealing method for dealing with raw material transportation ship operation scheduling. The scheduling algorithm should satisfy the proper stock for each raw material level by satisfying the restriction conditions of the transportation ship and the harbour equipment. The developed scheduling algorithm consists mainly of two parts: 1) the operation of the ship is simulated by decision variables, such as the order of the operation of ship and the type of raw material on-board, for calculating the amount of each raw material unloaded and the unloading time; and 2) the simulation calculates the change in the stock level of each raw material type based on the simulation result by which the first simulation is operated. The evaluation function, comprising the operating cost of the ship and the propriety of the stock level, can be calculated by using these two simulation results
  • Keywords
    materials handling; simulated annealing; simulation; transportation; raw material handling; scheduling; ship operation; simulated annealing; simulation; steelworks; transportation; unloading time; Cost function; Laboratories; Marine transportation; Marine vehicles; Optimization methods; Raw materials; Safety; Scheduling algorithm; Simulated annealing; Steel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 1999. IEEE SMC '99 Conference Proceedings. 1999 IEEE International Conference on
  • Conference_Location
    Tokyo
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-5731-0
  • Type

    conf

  • DOI
    10.1109/ICSMC.1999.816599
  • Filename
    816599