DocumentCode
3477023
Title
Research on preventive maintenance period of hydroelectric power equipments
Author
Zhong-Zhe Chen ; Pei-yu Ren ; Dong Wang
Author_Institution
Sch. of Mechatron. Eng., Univ. of Electron. Sci. & Technol. of China, Chengdu, China
fYear
2010
fDate
12-14 Jan. 2010
Firstpage
1
Lastpage
3
Abstract
In this paper, the failure number of hydroelectric power equipments in the whole life is predicted based on Crow-AMSAA Reliability Growth model. Considering influence of preventive maintenance to failure rate, service age reduction factor E is introduced to adjust service year of equipment and the maintenance cost model of hydroelectric equipments in the life cycle is derived. The optimal preventive maintenance period with minimum operation cost has been found. A new method to determine the cycle of the timed preventive maintenance for hydroelectric equipments has been proposed in this paper, which will be useful for maintenance management of electric power equipment.
Keywords
hydroelectric power stations; life cycle costing; power apparatus; power markets; preventive maintenance; research and development; Crow-AMSAA reliability growth model; hydroelectric power equipments; maintenance cost model; minimum operation cost; preventive maintenance period; Availability; Cost function; Hydroelectric power generation; Mechatronics; Power system reliability; Predictive models; Preventive maintenance; Reliability engineering; Statistics; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Prognostics and Health Management Conference, 2010. PHM '10.
Conference_Location
Macao
Print_ISBN
978-1-4244-4756-5
Electronic_ISBN
978-1-4244-4758-9
Type
conf
DOI
10.1109/PHM.2010.5413565
Filename
5413565
Link To Document