• DocumentCode
    3477023
  • Title

    Research on preventive maintenance period of hydroelectric power equipments

  • Author

    Zhong-Zhe Chen ; Pei-yu Ren ; Dong Wang

  • Author_Institution
    Sch. of Mechatron. Eng., Univ. of Electron. Sci. & Technol. of China, Chengdu, China
  • fYear
    2010
  • fDate
    12-14 Jan. 2010
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    In this paper, the failure number of hydroelectric power equipments in the whole life is predicted based on Crow-AMSAA Reliability Growth model. Considering influence of preventive maintenance to failure rate, service age reduction factor E is introduced to adjust service year of equipment and the maintenance cost model of hydroelectric equipments in the life cycle is derived. The optimal preventive maintenance period with minimum operation cost has been found. A new method to determine the cycle of the timed preventive maintenance for hydroelectric equipments has been proposed in this paper, which will be useful for maintenance management of electric power equipment.
  • Keywords
    hydroelectric power stations; life cycle costing; power apparatus; power markets; preventive maintenance; research and development; Crow-AMSAA reliability growth model; hydroelectric power equipments; maintenance cost model; minimum operation cost; preventive maintenance period; Availability; Cost function; Hydroelectric power generation; Mechatronics; Power system reliability; Predictive models; Preventive maintenance; Reliability engineering; Statistics; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Prognostics and Health Management Conference, 2010. PHM '10.
  • Conference_Location
    Macao
  • Print_ISBN
    978-1-4244-4756-5
  • Electronic_ISBN
    978-1-4244-4758-9
  • Type

    conf

  • DOI
    10.1109/PHM.2010.5413565
  • Filename
    5413565