DocumentCode :
3480122
Title :
Quick response replenishment: a case study
Author :
King, Russell E. ; Moon, Kara
Author_Institution :
Dept. of Ind. Eng., North Carolina State Univ., Raleigh, NC, USA
Volume :
2
fYear :
1999
fDate :
1999
Firstpage :
1341
Abstract :
We document a case study based upon an ongoing analysis for a U.S. fiber/fabric manufacturer who is expanding its operations vertically to include cut and sew operations in Mexico. We refer to this vertically integrated manufacturer as VIM. While some of the data have been changed to protect the sources, the story and results themselves are unchanged. More detail on this case can be found in Moon (1999)
Keywords :
computer integrated manufacturing; digital simulation; textile industry; case study; fabric manufacturer; fiber manufacturer; quick response replenishment; simulation; vertically integrated manufacturer; Clothing; Computer aided software engineering; Fabrics; Job shop scheduling; Lead time reduction; Marketing and sales; Moon; Packaging; Production; Pulp manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference Proceedings, 1999 Winter
Conference_Location :
Phoenix, AZ
Print_ISBN :
0-7803-5780-9
Type :
conf
DOI :
10.1109/WSC.1999.816863
Filename :
816863
Link To Document :
بازگشت