• DocumentCode
    3481600
  • Title

    Application of lean model to reduce waste of time in construction Case study of concreting task in Malaysia

  • Author

    Lajevardi, Ali ; Endut, Intan Rohani ; Paydar, Soleyman

  • Author_Institution
    Fac. of Civil Eng., Univ. Teknol. MARA, Shah Alam, Malaysia
  • fYear
    2011
  • fDate
    5-6 Dec. 2011
  • Firstpage
    345
  • Lastpage
    350
  • Abstract
    This paper is a case study in order to evaluate the result of implementing the relatively new productivity management approach “lean production” in local construction industry of Malaysia in order to achieve better project outcome. Delay in project delivery is a major issue of concern for managers of construction projects. Traditionally the management tried to put effort to decrease construction task time by increasing resources to reduce duration of process activities. However the objective of lean concept is to avoid project delay by looking to the whole construction tasks rather than what is called activity based thinking. This research analyzes a case study of concreting task by initially identifying activities that contribute to the waste of time and then determining the amount of those activities.
  • Keywords
    construction industry; lean production; productivity; Malaysia; activity based thinking; concreting task; construction projects; construction task time; lean model; lean production; local construction industry; productivity management; project delay; project delivery; Casting; Concrete; Construction industry; Inspection; Lean production; Productivity; Malaysia construction; construction management; lean construction; project delay; time waste; value creation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Humanities, Science and Engineering (CHUSER), 2011 IEEE Colloquium on
  • Conference_Location
    Penang
  • Print_ISBN
    978-1-4673-0021-6
  • Type

    conf

  • DOI
    10.1109/CHUSER.2011.6163748
  • Filename
    6163748