DocumentCode :
3487244
Title :
Change in approach to planning and operation of power systems under open access regime — Indian experience
Author :
Nayak, R.N. ; Sehgal, Y.K. ; Gupta, Manju
Author_Institution :
Power Grid Corp. of India Ltd., Gurgaon
fYear :
2005
fDate :
27-30 June 2005
Firstpage :
1
Lastpage :
6
Abstract :
The paper describes Indian power system and the reforms being undertaken to restructure it. Introduction of open access in transmission has been deliberated in detail. Various issues arising due to liberalized electricity market and the need of change in power system planning methods has been presented in the paper. Need of suitable mechanism for sharing of transmission charges in the deregulated regime is also deliberated.
Keywords :
power markets; power transmission planning; Indian power system; electricity market; open access regime-Indian experience; power system planning methods; Economies of scale; Electricity supply industry; Electricity supply industry deregulation; HVDC transmission; Joining processes; Power generation; Power grids; Power supplies; Power system interconnection; Power system planning; Inter-regional links; Long Term customer; Open Access; Right-of-Way; Short Term customer; Transmission Charges; Transmission system;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Tech, 2005 IEEE Russia
Conference_Location :
St. Petersburg
Print_ISBN :
978-5-93208-034-4
Electronic_ISBN :
978-5-93208-034-4
Type :
conf
DOI :
10.1109/PTC.2005.4524710
Filename :
4524710
Link To Document :
بازگشت