DocumentCode
3490804
Title
Placement of FACTS devices in open power market
Author
Singh, S.N. ; David, A.K.
Author_Institution
Dept. of Electr. Eng., Roorkee Univ., India
Volume
1
fYear
2000
fDate
30 Oct.-1 Nov. 2000
Firstpage
173
Abstract
The ongoing power system restructuring requires an opening of unused potentials of transmission systems due to environmental, right-of-way and cost problems which are major hurdles for power transmission network expansion. FACTS devices can be an alternative to reduce the flows in heavily loaded lines, resulting in an increased loadability, low system loss, improved stability of the network, reduced cost of production and fulfilled contractual requirement by controlling the power flows in the network. This paper suggests, first, the few optimal locations of FACTS devices and then determines the best optimal location in order to reduce the production cost along with the device cost. The allocation and requirement are also discussed. The effectiveness of the purposed methods is demonstrated on IEEE 14-bus system.
Keywords
costing; electricity supply industry; flexible AC transmission systems; optimisation; power system analysis computing; power transmission economics; power transmission planning; FACTS devices placement; IEEE 14-bus system; computer simulation; device cost; heavily loaded lines; loadability; open power market; power network stability; power system loss; power system restructuring; power transmission network expansion; production cost;
fLanguage
English
Publisher
iet
Conference_Titel
Advances in Power System Control, Operation and Management, 2000. APSCOM-00. 2000 International Conference on
Print_ISBN
0-85296-791-8
Type
conf
DOI
10.1049/cp:20000386
Filename
950290
Link To Document