DocumentCode
3490851
Title
Machining lines with multi-spindle workstations: a new optimization problem
Author
Dolgui, A. ; Ihnatsenka, I.
Author_Institution
Ecole des Mines de Saint-Etienne
Volume
1
fYear
2005
fDate
19-22 Sept. 2005
Lastpage
474
Abstract
This paper deals with a transfer line optimal design. In transfer lines, operations of the same block are executed simultaneously. Blocks are assigned to machines and they can be activated in mixed order. The set of all available blocks is given beforehand. The line investment cost is defined by the sum of blocks costs and stations costs. In addition to the standard line balancing problem, precedence and cycle time constraints, blocks compatibility and parallelism constraints must be taken into account. The problem is to assign all operations grouped into blocks that all constraints are respected and line investment cost is minimum. This paper is focused on solving the problem by a branch-and-bound algorithm. A new approach for obtaining a lower bound is offered. It is based on a reduction of the transfer line balancing problem to a set partitioning problem. Computational experiments provides that the proposed approach is efficient to solve practical transfer line design problems
Keywords
optimised production technology; tree searching; blocks compatibility; branch-and-bound algorithm; cycle time constraints; line investment cost; multispindle workstation; optimization problem; parallelism constraints; set partitioning problem; transfer line balancing problem; transfer line optimal design; Assembly; Costs; Design optimization; Investments; Machining; Mass production; Parallel processing; Partitioning algorithms; Time factors; Workstations;
fLanguage
English
Publisher
ieee
Conference_Titel
Emerging Technologies and Factory Automation, 2005. ETFA 2005. 10th IEEE Conference on
Conference_Location
Catania
Print_ISBN
0-7803-9401-1
Type
conf
DOI
10.1109/ETFA.2005.1612561
Filename
1612561
Link To Document