• DocumentCode
    3496962
  • Title

    Study on Automatic Forecasted Process Generation System for Frame Construction

  • Author

    Choi, Jeong-Phil ; Kim, Kyung-Hun ; Lee, Yoon-Sun ; Kim, Kyung-Hwan ; Kim, Jae-Jun

  • Author_Institution
    Dept. of Sustainable Archit. Enginr., Hanyang Univ., Seoul
  • Volume
    2
  • fYear
    2008
  • fDate
    11-13 Nov. 2008
  • Firstpage
    162
  • Lastpage
    165
  • Abstract
    The plan for steel frame process is essential and very important in modern constructions. However, there are errors on plans and highly inefficient at actual sites due to lack of data and planning based on subjective experience, lack of objective and systematic standard. Therefore, this study established a process automatically generating steel frame process that is easy to use at sites and minimizes errors.
  • Keywords
    steel industry; steel manufacture; automatic forecasted process generation system; frame construction; steel frame process; Cranes; Data mining; Hybrid power systems; Information technology; Machinery; Performance analysis; Steel; Structural beams; Technology forecasting; Time measurement; Automatic Forecasted Process;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Convergence and Hybrid Information Technology, 2008. ICCIT '08. Third International Conference on
  • Conference_Location
    Busan
  • Print_ISBN
    978-0-7695-3407-7
  • Type

    conf

  • DOI
    10.1109/ICCIT.2008.189
  • Filename
    4682232