Abstract :
Experience has proven that the reliability of a GIS/GIL can be ensured by an on-site AC-testing after assembly combined with a sensitive partial discharge measurement. Either conventional 50/60 Hz transformer systems or resonant test systems with variable inductance as well as resonant test systems with variable frequency have been used to perform the GIS/GIL on-site testing. The paper describes the different HV test systems with their advantages and limitations and the applicable partial discharge measuring methods. The UHF PD measuring method is emphasised
Keywords :
gas insulated substations; 50 Hz; 60 Hz; AC voltage; GIS; HV test systems; UHF PD measuring method; gas insulated lines; gas insulated substation; on-site testing; partial discharge measuring methods; resonant test systems; sensitive partial discharge measurement; variable inductance;
fLanguage :
English
Publisher :
iet
Conference_Titel :
High Voltage Engineering, 1999. Eleventh International Symposium on (Conf. Publ. No. 467)
Conference_Location :
London
ISSN :
0537-9989
Print_ISBN :
0-85296-719-5
Type :
conf
DOI :
10.1049/cp:19990928
Filename :
818280
Link To Document :
بازگشت