Title
Engineering challenges in a competitive electricity market
Author
Urwin, R.
Author_Institution
Nat. Grid Co. plc
Volume
5
fYear
1999
fDate
1999
Firstpage
366
Abstract
To meet the challenges of operating in a competitive electricity market NGC (National Grid Company) has adopted an engineering life cycle analysis, which focuses on the four stages of plant and system life, namely, design, buy and build, operate, and monitor and maintain. NGC´s R&D programme uses the same principles in focussing on day-to-day engineering issues so as to improve system reliability and flexibility, through the incorporation of new plant and technology, as well as, increasing the capability and availability of existing plant, and planning for the future. Some examples are given, from all four stages of the plant/system life cycle curve, in which NGC is actively pursuing research to meet the challenges it faces operating in an ever changing and competitive electricity market
Keywords
electricity supply industry; National Grid Company; R&D programme; buy and build; competitive electricity market; day-to-day engineering issues; engineering life cycle analysis; innovative design; maintenance planning; monitor and maintain; operate; plant/system life cycle curve; software tools; system design; system flexibility improvement; system reliability improvement; transmission system operation;
fLanguage
English
Publisher
iet
Conference_Titel
High Voltage Engineering, 1999. Eleventh International Symposium on (Conf. Publ. No. 467)
Conference_Location
London
ISSN
0537-9989
Print_ISBN
0-85296-719-5
Type
conf
DOI
10.1049/cp:19990960
Filename
818312
Link To Document