DocumentCode
3502753
Title
Bridging the gap between CASE and CAST
Author
Graham, J.A. ; Higgott, J.B. ; Hynes, A.J.
Author_Institution
British Telecomm. Plc., Ipswich, UK
fYear
1993
fDate
30 Aug-3 Sep 1993
Firstpage
317
Lastpage
324
Abstract
A prototype Test Support System (TSS) has been developed within BT. The objective of the TSS is to bridge the gap that currently exists between software development tools (CASE tools) and software testing tools (CAST tools). The aim being to provide end-to-end automation of the software development process and encourage test development in the earlier stages of the lifecycle. The TSS interfaces to a CASE tool and extracts relevant information from the system design. Extracted design information is developed into test procedures and test cases using a test development methodology. This methodology has been designed to comply with the internationally recognised test documentation standard IEEE-829. It can be used to develop unit, integration, system and acceptance tests, and is supported with a suite of tools. Test procedures and test cases can be extracted using the TSS and when fully developed can be executed on the target software using a test execution tool. The paper documents the experiences gained in development of the prototype TSS
Keywords
program testing; software tools; system documentation; BT; CASE; CAST; IEEE-829; Test Support System; design information; end-to-end automation; software development process; software development tools; software testing tools; system design; test documentation standard; Automatic testing; Automation; Bridges; Computer aided software engineering; Data mining; Life testing; Programming; Software prototyping; Software testing; System testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Software Engineering Standards Symposium, 1993. Proceedings., 1993
Conference_Location
Brighton
Print_ISBN
0-8186-4240-8
Type
conf
DOI
10.1109/SESS.1993.263937
Filename
263937
Link To Document