DocumentCode :
3503600
Title :
A manpower supply planning model for MRT carriage maintenance
Author :
Chen, Chia-Hung ; Yan, Shangyao ; Chen, Miawjane
Author_Institution :
Dept. of Logistics Manage., Shu-Te Univ., Taipei
Volume :
2
fYear :
2008
fDate :
12-15 Oct. 2008
Firstpage :
1823
Lastpage :
1828
Abstract :
In this study, we develop a manpower supply planning model for mass rapid transit carriage maintenance under mixed deterministic and stochastic. The model and the method used currently in actual operations are evaluated by a simulation-based evaluation method. Finally, we perform a case study using real operating data from a Taiwan MRT maintenance facility. The preliminary results are good, showing that the model could be useful for planning carriage maintenance manpower supply.
Keywords :
maintenance engineering; planning; rapid transit systems; stochastic programming; supply and demand; MRT carriage maintenance; manpower supply planning model; mass rapid transit; mixed deterministic model; simulation-based evaluation method; stochastic demand model; stochastic programming; Carriage maintenance; Manpower Supply; Mixed Integer Program; Stochastic Demands;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Service Operations and Logistics, and Informatics, 2008. IEEE/SOLI 2008. IEEE International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-2012-4
Electronic_ISBN :
978-1-4244-2013-1
Type :
conf
DOI :
10.1109/SOLI.2008.4682826
Filename :
4682826
Link To Document :
بازگشت