• DocumentCode
    3505799
  • Title

    The analysis to lead-time difference of exporting containers between Hong Kong and Yantian port

  • Author

    Bocheng, Chen ; Wenhuang, Liu ; Yingjie, Li ; Yangdi, Li Yingjie ; Ip, WH ; Gaoyuan, Chen

  • Author_Institution
    Grad. Sch. at Shenzhen, Tsinghua Univ., Shenzhen
  • Volume
    2
  • fYear
    2008
  • fDate
    12-15 Oct. 2008
  • Firstpage
    2415
  • Lastpage
    2420
  • Abstract
    The container delivery lead-time for the international logistics differs widely between Hong Kong and Yantian port, which is analyzed in this paper. As for container transportation, problems such as factory inventory barely exist, although the issue of "time storage" (safety time) does matter in the process. The staying time of containers varies from port to port, and is much longer than the transportation time which in that case could be omitted in the whole delivery time. Unfortunately extraordinary delay is always ignored by the port logistics researchers both inside and outside China. Furthermore, we consider that the following factors will greatly affect the lead-time estimation of the whole process. These include the time uncertainty in some middle phases, the difficulties in postponing deadlines, the cost of the compensating measures taken, and the enterprise tolerance capability due to delivery damage. We studied the difference starting from the data of the two ports and explored some underlying causes for the delays. The preliminary analysis showed that the differences between the regulations of the study groups, regulations regarding customs supervision, and the port management styles and practices between the two areas were main causes of the time difference.
  • Keywords
    containerisation; estimation theory; goods distribution; international trade; logistics; Hong Kong port; Yantian port; compensation measure cost; container export; container transportation; customs supervision regulation; deadline postponment; empirical study; enterprise tolerance capability; factory inventory; international logistics; lead-time difference estimation; port management style; time uncertainty; Yantian port; international logistic; lead-time; port logistics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Operations and Logistics, and Informatics, 2008. IEEE/SOLI 2008. IEEE International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-2012-4
  • Electronic_ISBN
    978-1-4244-2013-1
  • Type

    conf

  • DOI
    10.1109/SOLI.2008.4682941
  • Filename
    4682941