    Substitution Scheduling of Human Resources in Project

  • Author

    Liu, Zhenyuan

  • Author_Institution
    Inst. of Syst. Eng., Huazhong Univ. of Sci. & Technol., Wuhan
  • fYear
    2007
  • fDate
    21-25 Sept. 2007
  • Firstpage
    5172
  • Lastpage
    5175
  • Abstract
    Substitution scheduling of human resources is an important and factual problem in project management. The problem is presented as a mix integer programming model with the objective of minimizing total cost of project considering reward of early completion and delay penalty. A heuristics is developed to solve the model, in which the main framework is an enumeration procedure embedded a serial scheduling schema for solution of project scheduling problem with the same objective, and its time complexity is analyzed. The result of a computational example shows that the approach is feasible.
  • Keywords
    human resource management; integer programming; labour resources; project management; scheduling; delay penalty; human resources; mix integer programming model; project management; serial scheduling schema; substitution scheduling; time complexity; Costs; Delay; Genetic algorithms; Humans; Linear programming; Processor scheduling; Project management; Recruitment; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-4244-1311-9
  • Type

    conf

  • DOI
    10.1109/WICOM.2007.1266
  • Filename
    4341041