DocumentCode
3509620
Title
Game Analysis of Bidding with Base Price in Construction Projects
Author
Long Zi-quan ; Li Meng
Author_Institution
Sch. of Econ. & Manage., Wuhan Univ., Wuhan
fYear
2007
fDate
21-25 Sept. 2007
Firstpage
5297
Lastpage
5300
Abstract
In China, the bidding mechanism with base price is still widely used in construction projects nowadays. The aim of this paper, with help of game theory, is to analyze the bidding which has the base price and regards the inviter as one of the participants in construction projects. Firstly, a brief description of the bidding process based on game theory is presented. The paper then deeply analyzes bidding decisions according to two different circumstances: on condition that costs of bidders become common knowledge and on condition that bidders can only get incomplete information. It is found that, in the former circumstance, bidders need to consider costs and should make an estimate of the base price when there is no significant difference among their costs. However, in the latter circumstance, if bidders´ costs are estimated lower than the base price, they could decide the equilibrium bidding strategies themselves. Finally, the paper closes with recommendations and applicative conditions of the bidding strategies.
Keywords
construction industry; game theory; pricing; public administration; bidding; construction projects; game analysis; game theory; Costs; Environmental economics; Game theory; Information analysis; Project management; Road transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location
Shanghai
Print_ISBN
978-1-4244-1311-9
Type
conf
DOI
10.1109/WICOM.2007.1297
Filename
4341072
Link To Document