DocumentCode :
3509966
Title :
The load shedding scheme design for an integrated steelmaking cogeneration facility
Author :
Chen, Christopher S. ; Chen, James K.
fYear :
1995
fDate :
7-11 May 1995
Firstpage :
113
Abstract :
This paper develops the coordination of a load shedding scheme for a large industrial customer with several cogenerator units. A detailed description of each design procedure is included. The loads are tripped by underfrequency relays to prevent the power system from collapse when the plant becomes isolated due to an electric utility service outage. Different system fault cases have been selected to derive the proper formulation of load shedding scheme according to historical operation records. The key factors such as frequency settings, number of load shedding steps, size and location of the loads to be tripped, relay time delay and coordination with the generator protection scheme are examined through simulation using the transient stability program. The proper load shedding scheme has been designed and the related hardware has been installed in the plant to keep the system from blackout when disturbances occur
Keywords :
Delay effects; Frequency; Industrial power systems; Power industry; Power system faults; Power system relaying; Power system transients; Protection; Protective relaying; Stability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial and Commercial Power Systems Technical Conference, 1995. Conference Record, Papers Presented at the 1995 Annual Meeting., 1995 IEEE
Conference_Location :
San Antonio, TX, USA
Print_ISBN :
0-7803-2479-X
Type :
conf
DOI :
10.1109/ICPS.1995.526997
Filename :
526997
Link To Document :
بازگشت