DocumentCode
3512864
Title
The rush-repair task assignment model of damage equipment based on urgent level
Author
Zhang, Lin ; Yu, Jiang-Min ; Wang, Wen-Feng ; Fan, Wen-Xin
Author_Institution
Missile Inst. Air Force Eng., Univ. Sanyuan, Shannxi, China
fYear
2009
fDate
20-24 July 2009
Firstpage
674
Lastpage
677
Abstract
Based on the characteristics of the equipment support and the current war factual situation, the rush-repair task of damage equipment was classified according to different urgent level. Then the rush-repair task assignment model was made based on the urgent level of the damaged equipment, and the method is given to solve the model. Finally, the example validates the model and the result indicates that the method operate simply and availability.
Keywords
maintenance engineering; matrix algebra; military equipment; optimisation; weapons; damaged military equipment; matrix algebra; optimisation; rush-repair task assignment model; urgent level; war factual situation; weapon; Command and control systems; Missiles; Weapons; assignment model; rush-repair; urgent level;
fLanguage
English
Publisher
ieee
Conference_Titel
Reliability, Maintainability and Safety, 2009. ICRMS 2009. 8th International Conference on
Conference_Location
Chengdu
Print_ISBN
978-1-4244-4903-3
Electronic_ISBN
978-1-4244-4905-7
Type
conf
DOI
10.1109/ICRMS.2009.5270102
Filename
5270102
Link To Document