Development Plan of the Electrical Sector of Venezuela and the Effects of Gas Availability
Author :
Palmero, M.C. ; Quijada, M.
Author_Institution :
EDELCA, Caracas
fYear :
2006
fDate :
15-18 Aug. 2006
Firstpage :
1
Lastpage :
4
Abstract :
The Venezuela´s development plan for the electrical service (PDSEN) 2005-2024 has as main goal to determine the generation requirements and transmission expansion to meet the demand in such period. The most important assumptions for PDSEN were that there would be gas enough for this period and the price would be unique for all areas. Those assumptions were critical since they determined which technology would be used in any area and also the generation capacity to be installed. Based on that, it was necessary to perform a sensitivity analysis to take into account the effect of price and gas supply variations in the new planned facilities for generation and transmission
Keywords :
gas turbine power stations; power generation planning; power transmission planning; Venezuela; development plan; electrical sector; gas availability; gas supply; generation capacity; generation requirements; sensitivity analysis; transmission expansion; Availability; Costs; Fossil fuels; Hydraulic turbines; Hydroelectric power generation; Hydroelectric-thermal power generation; Power generation; Power system interconnection; Production; Voltage; expansion; generation; natural gas; planning; transmission;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission & Distribution Conference and Exposition: Latin America, 2006. TDC '06. IEEE/PES
Conference_Location :
Caracas
Print_ISBN :
1-4244-0287-5
Electronic_ISBN :
1-4244-0288-3
Type :
conf
DOI :
10.1109/TDCLA.2006.311432
Filename :
4104663
Link To Document :
بازگشت