DocumentCode
3517003
Title
Application of modified shortest path algorithm for project duration assessment
Author
Dobrilovic, D. ; Jevtic, V. ; Stojanov, J.
Author_Institution
Tech. Fac. Mihajlo Pupin, Univ. of Novi Sad, Zrenjanin, Serbia
fYear
2011
fDate
19-21 May 2011
Firstpage
495
Lastpage
498
Abstract
As one of the triple constraint of project management, project completion time is very important issue. This is considerable for wide range of projects, especially for the time-terminated ones. Beside standard network planning methods, such as CPM, PERT, PDM etc. there are variety of alternative methods, based on previous ones, which are used in order to obtain even better project duration evaluations. In these methods researchers includes simulation, fuzzy theory, genetic algorithms etc. This paper describes the approach in modification of shortest path search algorithms and their usage in project duration assessment. Presented modification of shortest path algorithms is focused on its conversion to finding longest path in the network diagram i.e. to finding critical path of the project.
Keywords
fuzzy set theory; genetic algorithms; project management; simulation; CPM; PDM; PERT; fuzzy theory; genetic algorithms; modified shortest path algorithm; network planning methods; project completion time; project duration assessment; project management; simulation; Algorithm design and analysis; Heuristic algorithms; Internet; Project management; Software; Software algorithms; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Applied Computational Intelligence and Informatics (SACI), 2011 6th IEEE International Symposium on
Conference_Location
Timisoara
Print_ISBN
978-1-4244-9108-7
Type
conf
DOI
10.1109/SACI.2011.5873054
Filename
5873054
Link To Document