• DocumentCode
    3517003
  • Title

    Application of modified shortest path algorithm for project duration assessment

  • Author

    Dobrilovic, D. ; Jevtic, V. ; Stojanov, J.

  • Author_Institution
    Tech. Fac. Mihajlo Pupin, Univ. of Novi Sad, Zrenjanin, Serbia
  • fYear
    2011
  • fDate
    19-21 May 2011
  • Firstpage
    495
  • Lastpage
    498
  • Abstract
    As one of the triple constraint of project management, project completion time is very important issue. This is considerable for wide range of projects, especially for the time-terminated ones. Beside standard network planning methods, such as CPM, PERT, PDM etc. there are variety of alternative methods, based on previous ones, which are used in order to obtain even better project duration evaluations. In these methods researchers includes simulation, fuzzy theory, genetic algorithms etc. This paper describes the approach in modification of shortest path search algorithms and their usage in project duration assessment. Presented modification of shortest path algorithms is focused on its conversion to finding longest path in the network diagram i.e. to finding critical path of the project.
  • Keywords
    fuzzy set theory; genetic algorithms; project management; simulation; CPM; PDM; PERT; fuzzy theory; genetic algorithms; modified shortest path algorithm; network planning methods; project completion time; project duration assessment; project management; simulation; Algorithm design and analysis; Heuristic algorithms; Internet; Project management; Software; Software algorithms; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Applied Computational Intelligence and Informatics (SACI), 2011 6th IEEE International Symposium on
  • Conference_Location
    Timisoara
  • Print_ISBN
    978-1-4244-9108-7
  • Type

    conf

  • DOI
    10.1109/SACI.2011.5873054
  • Filename
    5873054