• DocumentCode
    3527412
  • Title

    Case study on optimization strategy of utility of coal mine crisis reduction capability

  • Author

    Liu, Tie-zhong ; Li, Wei

  • Author_Institution
    Sch. of Manage. & Econ., Beijing Inst. of Technol., Beijing, China
  • Volume
    Part 2
  • fYear
    2011
  • fDate
    3-5 Sept. 2011
  • Firstpage
    1221
  • Lastpage
    1227
  • Abstract
    Using the empirical research methods, the optimization strategy of coal mine crisis reduction capability utility was discussed from the perspective of the coal mine employee utility. Five elements of coal mine crisis reduction capability were put forward which consist of environmental preparation, organizational preparation, personnel preparation, competitive preparation and learning preparation, as well as four elements of staff utility of coal mine which consist of enterprise and job satisfaction, communication satisfaction, benefit satisfaction and promotion satisfaction. The questionnaire was designed based on the Likert six-point scale. JCMG was chosen as sample, then statistical method, reliability analysis and Structural Equation Method were used to analysis the data. The conclusion of the optimization strategy of the coal mine crisis reduction capability based on the utility was obtained: first, strengthening the coal mine crisis study; second, promoting the competitiveness of the coal mine; third, concerning employees´ enterprise and job satisfaction to influence the environment preparation element; forth, special concerning the coal mine employees´ promotion satisfaction to prevent the negative influence.
  • Keywords
    coal; corporate social responsibility; employee welfare; industrial psychology; mining industry; organisational aspects; personnel; reliability; risk analysis; statistical analysis; strategic planning; Likert six point scale; benefit satisfaction; coal mine crisis reduction capability; communication satisfaction; employee utility; environmental preparation; job satisfaction; learning preparation; optimization strategy; organizational preparation; personnel preparation; promotion satisfaction; reliability analysis; statistical method; structural equation method; Accidents; Analytical models; Coal; Coal mining; Fitting; Mathematical model; Organizations; crisis reduction capability of coal mine; employee satisfaction; employee utility of coal mine; optimization strategy;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
  • Conference_Location
    Changchun
  • Print_ISBN
    978-1-61284-446-6
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2011.6035376
  • Filename
    6035376