DocumentCode :
3528987
Title :
Three-dimensional gantt chart based resource-constrained multiple projects scheduling and critical chain identification
Author :
Wang, J.Q. ; Zhang, S.F. ; Chen, J. ; Wang, S. ; Zhang, Y.F.
Author_Institution :
Inst. of Syst. Integrated & Eng. Manage., Northwestern Polytech. Univ., Xi´´an, China
Volume :
Part 3
fYear :
2011
fDate :
3-5 Sept. 2011
Firstpage :
1597
Lastpage :
1601
Abstract :
Aiming at resources-constrained multiple projects scheduling problem (RCMPSP), a three-dimensional representation is presented through extending the two-dimensional representation of resources-constrained scheduling problem by adding resource dimension to the two-dimensional Gantt chart. It can clearly display the resources consumption of every activity and provide valuable reference for concerning bottleneck resources and solving the resources conflict. In addition, a hybrid algorithm which combined the merits of bidirectional scheduling and parallel schedule generation scheme (PSGS) is proposed to optimize the RCMPSP. Furthermore how to use the presented three-dimensional Gantt chart to represent the schedule and identify critical chain is also described in details. The results of single project with single resource scheduling, single project with multiple resources scheduling, multiple projects with single resource scheduling and multiple projects with multiple resources scheduling show that the proposed approach is effective and explicit for resource constrained project scheduling and critical chain identification.
Keywords :
bar charts; job shop scheduling; project management; resource allocation; bidirectional scheduling; critical chain identification; job shop scheduling; multiple resources scheduling; parallel schedule generation scheme; resource constrained project scheduling; resource dimension; resources consumption; resources-constrained multiple projects scheduling problem; single resource scheduling; three-dimensional Gantt chart; three-dimensional representation; Europe; Job shop scheduling; Optimal scheduling; Schedules; Scheduling algorithm; Three-dimensional Gantt chart; critical chain; resource-constrained multiple projects scheduling problem (RCMPSP);
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location :
Changchun
Print_ISBN :
978-1-61284-446-6
Type :
conf
DOI :
10.1109/ICIEEM.2011.6035465
Filename :
6035465
Link To Document :
بازگشت