• DocumentCode
    3528987
  • Title

    Three-dimensional gantt chart based resource-constrained multiple projects scheduling and critical chain identification

  • Author

    Wang, J.Q. ; Zhang, S.F. ; Chen, J. ; Wang, S. ; Zhang, Y.F.

  • Author_Institution
    Inst. of Syst. Integrated & Eng. Manage., Northwestern Polytech. Univ., Xi´´an, China
  • Volume
    Part 3
  • fYear
    2011
  • fDate
    3-5 Sept. 2011
  • Firstpage
    1597
  • Lastpage
    1601
  • Abstract
    Aiming at resources-constrained multiple projects scheduling problem (RCMPSP), a three-dimensional representation is presented through extending the two-dimensional representation of resources-constrained scheduling problem by adding resource dimension to the two-dimensional Gantt chart. It can clearly display the resources consumption of every activity and provide valuable reference for concerning bottleneck resources and solving the resources conflict. In addition, a hybrid algorithm which combined the merits of bidirectional scheduling and parallel schedule generation scheme (PSGS) is proposed to optimize the RCMPSP. Furthermore how to use the presented three-dimensional Gantt chart to represent the schedule and identify critical chain is also described in details. The results of single project with single resource scheduling, single project with multiple resources scheduling, multiple projects with single resource scheduling and multiple projects with multiple resources scheduling show that the proposed approach is effective and explicit for resource constrained project scheduling and critical chain identification.
  • Keywords
    bar charts; job shop scheduling; project management; resource allocation; bidirectional scheduling; critical chain identification; job shop scheduling; multiple resources scheduling; parallel schedule generation scheme; resource constrained project scheduling; resource dimension; resources consumption; resources-constrained multiple projects scheduling problem; single resource scheduling; three-dimensional Gantt chart; three-dimensional representation; Europe; Job shop scheduling; Optimal scheduling; Schedules; Scheduling algorithm; Three-dimensional Gantt chart; critical chain; resource-constrained multiple projects scheduling problem (RCMPSP);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
  • Conference_Location
    Changchun
  • Print_ISBN
    978-1-61284-446-6
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2011.6035465
  • Filename
    6035465