• DocumentCode
    3529134
  • Title

    Application of grey prediction models in final assembly duration of civil aircraft

  • Author

    Guo, Wei-dong ; Wei, Fa-jie

  • Author_Institution
    Dept. of Manage. Sci. & Eng., Beihang Univ., Beijing, China
  • Volume
    Part 3
  • fYear
    2011
  • fDate
    3-5 Sept. 2011
  • Firstpage
    1648
  • Lastpage
    1650
  • Abstract
    As a basis for rational organized production, yearly production program and production planning are made respectively according to assembly cycle, which is a significant link of the whole process and has a great impact on the performance, lifespan and cost of production itself. Aiming at the complicated process of airplane assembly and less sample data, combining with the characteristics of Grey System Theory, this paper chooses the GM (1, N) to obtain a precise model by estimating the aircraft assembly duration.
  • Keywords
    aircraft manufacture; assembling; grey systems; production planning; aircraft assembly duration; airplane assembly; civil aircraft; final assembly duration; grey prediction model; grey system theory; production planning; rational organized production; yearly production program; Aircraft; Assembly; Atmospheric modeling; Brain models; Predictive models; Production; Grey system theory; aircraft final assembly; estimate;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
  • Conference_Location
    Changchun
  • Print_ISBN
    978-1-61284-446-6
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2011.6035476
  • Filename
    6035476