DocumentCode
3529787
Title
A dynamic mechanism of risk allocation of construction project from perspective of incomplete contract theory: A theoretical model
Author
Zhao, Hua ; Yin, Yi-lin
Author_Institution
Dept. of Manage. & Econ., Tianjin Univ., Tianjin, China
Volume
Part 3
fYear
2011
fDate
3-5 Sept. 2011
Firstpage
1816
Lastpage
1820
Abstract
Proper risk allocation (RA) can promote project management performance by means of contract clauses, but the existing researches were mainly on the philosophy of one-time and static RA, which hindered the project management performance improvement persistently. On the basis of literature review, the paper pointed out the characteristic of dynamic RA , and further analyzed the RA contract clauses of incomplete contract nature, and established a theory model of dynamic RA in construction project which includes initial RA and risk reallocation, which has important significance on reasonable RA in the process of contract negotiation between the project owner and the contractor.
Keywords
construction industry; contracts; project management; risk management; construction project; contract clauses; dynamic RA; incomplete contract theory; project management performance; risk allocation; Contracts; Dynamic scheduling; Economics; Educational institutions; Project management; Resource management; Risk management; Construction Project; Dynamic Mechanism; Incomplete Contract Theory; Risk Allocation;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location
Changchun
Print_ISBN
978-1-61284-446-6
Type
conf
DOI
10.1109/ICIEEM.2011.6035518
Filename
6035518
Link To Document